Contact us

WhatsApp:   +8613513255919

Email:  yungaobm@gmail.com

Headquarters Address:Room 711,7th Floor

Building B1698 Weiguo North Road

Tangshan City,Hebei Province

Factory Address:High-tech Development Zone

Chengde County,Hebei Province

undefined
undefined
+
  • undefined
  • undefined

Post-Tensioning Duct Grout

Duct grout is applied to various railway and highway post-tensioned prestressed bridge duct grouting, large prestressed structure duct grouting, as well as void filling and repair work.

Details

Duct grout is applied to various railway and highway post-tensioned prestressed bridge duct grouting, large prestressed structure duct grouting, as well as void filling and repair work.

Duct grout products feature excellent fluidity, stable slurry, good filling capacity, adjustable setting time, non-shrinkage, slight expansion, high strength, and contain no harmful substances to steel reinforcement.

Item

Performance Index

Setting Time (h)

Initial Setting

≥5

Final Setting

≤14

Fluidity (s)

Initial

≤17

30min

≤20

60min

≤25

Free Bleeding Rate (%)

3h

0

24h

0

Bleeding Rate between Wires (%)

4h

0

Pressure Bleeding Rate (%)

0.22 MPa

≤1.0

0.36 MPa

≤2.0

Free Expansion Rate (%)

3h

0~1.0

24h

0~2.0

Restricted Expansion Rate (%)

In water 7d

0.03~0.1

Compressive Strength (MPa)

7d

≥40

28d

≥50

Flexural Strength (MPa)

7d

≥6.0

28d

≥10.0

Filling Capacity

Qualified

  • Highway duct grout (agent) complies with JT/T 946-2014.
  • Railway duct grout (agent) complies with TB/T 3192-2008 and GB 50448-2015 "Technical Code for Application of Cementitious Grout".

Keyword:

Post-Tensioning Duct Grout

Inspection Report

Factory Building
A corner of the factory grounds
Testing Equipment
Office Building

Previous :

Previous :

None

Get Quote

We will get back to you within one business day. Please check your email regularly.

Submit

Inquiry Now

We will get back to you within one business day. Please check your email regularly.

Submit